Cloud Migration & Hybrid/Multi-Cloud Strategy
Cloud migration fails most often for organisational reasons, not technical ones: workloads are lifted and shifted without being understood, costs balloon, and teams are left operating an unfamiliar platform. We start with a workload-by-workload assessment — dependencies, data gravity, compliance constraints, licensing, traffic patterns and cost baseline — because the right destination differs per workload: rehost, replatform, refactor, or stay on-premises behind a hybrid design.
Migration itself is sequenced to limit blast radius. We build a landing zone first — accounts and projects, network topology, identity and access, guardrails, logging and a cost-tagging standard — so every migrated workload lands on governed ground. Then workloads move in waves, each with defined success criteria: cutover runbooks, rollback plans, data-sync verification and post-move validation. Cutover windows are rehearsed, not improvised.
For organisations that intentionally span providers, we design hybrid and multi-cloud architecture on its own merits: data locality and sovereignty requirements, latency to users, vendor leverage and resilience against provider-level incidents. The goal is portability by design — infrastructure defined in code, traffic managed at an abstraction layer, and exit costs understood before they matter.